Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Description of metal building packages ( made of steel frame ) :
Steel structure building is a new type of building structure system , which is formed by the main steel framework linking up H-section , Z-section , and U-section steel components , roof and walls using a variety of panels and other components such as windows and doors . Steel structure building is widely used in warehouses , workshops , large factories , and so on .
Dimensions | Length | H-beam : 4000 - 15000mm |
Thickness | web plate : 6 - 32mm wing plate : 6 - 40mm | |
Height | 200 - 1200mm | |
Color | according to customers | |
Main components | Main frame | |
Purlin | C or Z section steel purlin | |
Brace | Anchor , ordinary , high strength bolt | |
Bolt | Sandwich panel or steel plate | |
Roof & wall | PVC or aluminum alloy door | |
Door | Sliding or rolling door | |
Insulation panel | EPS , Rock wool , PU sandwich | |
Material | Q235B , Q345B China standard steel | |
Sheet | 0.5mm or 0.6mm galvanized sheet |
2. Why Our metal building packages ( made of steel frame ) is your Right Choice:
1) Stable and deep financial capacity
Any investment is an important decision and should be realized through a financially stable company. Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.
2) Competitive Prices
Our production capacity(approximately 200,000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
3) Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced design software we use.
4) Fast Delivery
We are able to design, detail, fabricate and supply simple steel buildings in approximately 4 weeks. Most of our buildings are delivered and erected within 8 weeks(this relies on various factors such as site position, weather etc).
5) Site Supervision
A site supervisor is always present at site to ensure that work is being carried out satisfactorily. Any problems that arise are quickly dealt with to minimize any delays. Safety on site is also made a priority.
3. Project case- Ningxia prefabricated steel structure workshop, 23000 SQM:
main structure:welding H steel or round steel
knee brace: Angle steel
roof ridge: corrugated steel sheet
Wrapping cover:color steel sheet
roof gutter: color steel sheet
rain spout: PVC pipe
doors: sliding sandwich panel door or metal door
windows: PVC OR ALUMINUM WINDOW
connecting: high strength bolts
characteristic: environment-friendly
lower cost and maintenance easily
4. Our technical team' s ability for metal building packages ( made of steel frame ) :
1) We have 80 persons' design team with more than 20 years experience, who can provide the most reasonable proposal. We can offer AutoCAD proposal drawing according to your ideas, customer's drawing are welcomed. Clear span without middle column can reach to 30 meters.
2) 3D photos for pre-view how' s your building looks like is available.
3) Blueprint drawing is available.
4) Professional production drawing control excellent quality.
5) Very details installation drawing. Engineer on-site guidance is available
5. Our seaworthy packing system for metal building packages ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How about the derust grade of your metal building packages ( made of steel frame ) ?
Reply: Ball blasting Sa2.5 on main steel structure or by Galvanized frame;
manual derust St2.5 on secondary steel structure.
2) What kind of panel used for the roof and wall ?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation, sound insulation. Common sandwich materials are EPS, glass wool and PU sandwich panels.
3) Are metal building packages ( made of steel frame ) expensive ?
Answer: The steel structure of our company is economic. Its technology and materials used decreases waste expenses such as wood, decorative stone, brick etc. All the material including the steel frames, wall body and roof for installation are prefabricated during the production process, therefore the labor costs for installation is decreased.