Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Structure  > welded steel structures  > built-up steel beam formed pre built buildings heavy-duty for Khartoum client

built-up steel beam formed pre built buildings heavy-duty for Khartoum client 

Price: 1000.0 USD 
Payment Terms: T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-110
Production Capacity: 3000 Ton/per Week
Delivery Date: 30 days
Top client Serviced: SIEMENS, American GE, FRANC...
Standard: European standard American ...
Drawing Design: dwgs Detailing by us
Means of Transport: Ocean
Packing: sea worthy packing
Brand Name: HX
Material Grade: Chinese Q235& Q345B ASTM A...
Surface Treatment: painted with Hempel painte...

1. 200, 000 square meter of factory space
2. Branded and reputed consumables are used
3. Feature: Environmental-friendly, Recyclable

1. Characteristics for the Steel building ( made of built-up steel beam ) :

1 ) Wide span : single span or multiple spans , the max span is 36m without middle column .

2 ) Low cost : Unit price range from USD35 / m2 to USD70 / m2 according to customers' request .

3 ) Fast construction and easy installation .

4 ) Long using life : up to 50 years .

5 ) Easy construction , time-saving , and labor saving 
6 ) Flexible layout , beautiful appearances , and higher space efficiency 
7 ) Be used as warehouses , workshops , shopping mall , dinning hall , stadium , etc .

8 ) Others : environmental protection , stable structure , earthquake proofing , water proofing , and energy conserving .

 

2. About us:

Our company is established in Shandong China, with 10 advanced production lines. We have over 1000 employee and around 80 experienced engineers, so we can offer you design, production, installation service at any time. So, we have enough ability and experience to do your project well. And we can also provide more solutions for customers.

 

Our product: Steel building ( made of built-up steel beam ) , industrial steel structure, civil steel structure, steel high rise buildings, steel warehouse&workshop, steel hanger, etc

 

3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:

Main steel frame:

Steel beam & column: Q345, Welded H beam

Wind-resistant column: Q345, Welded H beam

Secondary frame:

Roof purlin: Z250*75*20*2.2

Ceiling purlin: C120*50*20*2.2

Wall purlin: C180*70*20*2

Tie bar: 102*2

Vertical & horizontal bracing: 20

Kneel-bracing: L504

Purlin bracing: Q235, 12

Sleeves tube: Q235, 32*2.5

Roof system:

Type V930 pu panel 0.5/100/0.6mm Pu panel

Wall system:

Type v930 panel 0.5/100/0.6mm Pu panel

 

This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.

 

 

4. Our service for the product of Steel building ( made of built-up steel beam ) :

1) We provide free design and technical support work: according to the plan, size requirements, use function and load conditions provided by the owner; we will provide free architecture scheme drawings, component detail drawings, installation instruction drawing, installation instructions files.

2) Coordination in product transportation

We' ll track products' transportation in whole course, and actively help customers solve all problems during product transportation.

3) Installation guidance

If our customer needs, we will assign engineers for on-site installation guidance work.

 

5. Packaging & Shipping for Steel building ( made of built-up steel beam ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) Q: How could I control the cost of building a Steel building ( made of built-up steel beam ) ?

A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

 

2) Q: How Long does it take to build a Steel building ( made of built-up steel beam ) ?

A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.

 

3) Q: Is it difficult to build a Steel building ( made of built-up steel beam ) ?

A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: