Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Why give the production job of Steel building ( made of built-up steel column ) to us :
1) CNC punching machine , CNC bending machine , CNC welding machine , plasma cutting , high-power laser cutting and water jet cutting . available to provide multiple cutting service .
2) Well-experienced engineer team and production team for steel structure fabrication , welder working with CWI certificate , according to WPS ( welding procedure specification ) and PQR ( procedure qualification record ) .
3) Professional non-destructive testing , fully equipped .
4) Four painting line can supply high and quickly painting service . Professional surface treatment : hot-dip galvanizing , sandblasting , paint spraying , powder coating , plating .
5) More than 8 years in steel structure experience .
6) Full set of manufacturing process plan to ensure delivery on time .
2. Why Our Steel building ( made of built-up steel column ) is your Right Choice:
1) Stable and deep financial capacity
Any investment is an important decision and should be realized through a financially stable company. Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.
2) Competitive Prices
Our production capacity(approximately 200,000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
3) Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced design software we use.
4) Fast Delivery
We are able to design, detail, fabricate and supply simple steel buildings in approximately 4 weeks. Most of our buildings are delivered and erected within 8 weeks(this relies on various factors such as site position, weather etc).
5) Site Supervision
A site supervisor is always present at site to ensure that work is being carried out satisfactorily. Any problems that arise are quickly dealt with to minimize any delays. Safety on site is also made a priority.
3. Project case- Shandong Weifang Metal Logistics Co., Ltd light steel structure warehouse, 17000 SQM:
Type: Welded H-Section Steel
Forming: Hot-Rolled Steel
Crane:with or Without(1 to 50 Tons)
External Wall Design: EPS/ Rock Wool/ Polyurethane/ MGO/ Cement Foam Panel
Life Time of Steel Frame:More Than 50 Years
Packing Method: Flat Pack, Open Top Container, by Steel Skid, etc.
Raw Materials: Q235/ Q345
Door: Sliding Door, Roller Door, Steel Door etc.
Window: PVC, Aluminium( Sliding and Fix)
4. We can provide shop and installation drawing for Steel building ( made of built-up steel column ) :
1) After reaching a contract, we will carry out a detailed design in terms of the structural drawing and architectural drawing, build a three-dimensional model system by Tekla Structures( Xsteel) , and work out the shop drawing of each component efficiently and accurately. This not only can benefit future precise manufacturing but also can avoid component collision during construction in later stage.
2) We produce according to the process drawing and make delivery according to the shipping list.
3) We provide a complete set of installation drawings. If the customer has requirements, we can provide installation guiding services.
5. Packing & Delivery for Steel building ( made of built-up steel column ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) How to buy your ideal Steel building ( made of built-up steel column ) ?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.
2) What is the delivery time of Steel building ( made of built-up steel column ) ?
A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.
3) How to install after the goods arriving destination ?
A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
4) Q: Does your steel building can only be used in residential building ?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.