Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Structure  > welded steel structures  > connection of steel structure formed metal buldings recyclable at Mbabane area

connection of steel structure formed metal buldings recyclable at Mbabane area 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-116
Production Capacity: 10000 Ton/per Month
Delivery Date: 15 to 40 days
Top client Serviced: SIEMENS, American GE, FRANC...
Installation: Provide full set of constru...
Material Grade: European S235& S355 ASTM A3...
Means of Transport: Ocean
Packing: sea worthy packing
Brand Name: HX
Quality Control: The third party, SGS, ASIA ...
Certificates:: EN-1090 CE certificate, Ame...

1. For big single steel parts, no need to pack
2. Certification ISO9001: 2008, by BV France
3. Our products have been export to 50 countries

1. Our excellent design team will design the Steel building ( made of connection of steel structure ) for you . If you give the following information :

1 ) Data for design

   Wind speed ( KM /H )

   Snow load : ( KG / M2 )

   Rain load ( KG / M2 )

   Earthquake load if have

   Demands for doors and windows

   Crane ( if have ) , Crane span , crane lift height , max lift capacity , max wheel pressure and min wheel pressure !

 

2 ) Material quality

   Windows and doors quantity , size and location

   Roof and wall material , sandwich panel or corrugated steel sheet ( steel sheet can not heat insulation ) 

 

3 ) Type

    Size -- width , length , eave height and roof slope

   Single slope or double slope

   Single floor , double floor or multi floor

 

2. Wide Fields of Steel Structure be used:

1) Industrial steel structure warehouse, Steel building ( made of connection of steel structure )

2) Steel workshop / hangar / garage

3) prefabricated steel structure shed, Exhibition Hall, Office buildings

4) Garage, Musty-story building, Agricultural storage

5) Logistic centers and all kinds of steel structure buildings etc

 

3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:

Main steel frame:

Steel beam & column: Q345, Welded H beam

Wind-resistant column: Q345, Welded H beam

Secondary frame:

Roof purlin: Z250*75*20*2.2

Ceiling purlin: C120*50*20*2.2

Wall purlin: C180*70*20*2

Tie bar: 102*2

Vertical & horizontal bracing: 20

Kneel-bracing: L504

Purlin bracing: Q235, 12

Sleeves tube: Q235, 32*2.5

Roof system:

Type V930 pu panel 0.5/100/0.6mm Pu panel

Wall system:

Type v930 panel 0.5/100/0.6mm Pu panel

 

This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.

 

 

4. Our complete flow Service for the Steel building ( made of connection of steel structure ) :

1) Before sales of prefab steel structure building: We will provide you the most suitable product, guide our customer to find the products you most needed, assure that our customer can pay least money and get most return.

2) Technical Consultation and Suggestion before Construction: We provide professional consultation and suggestion service for customers' project evaluation about how cost and duration.

3) After sales service of prefab steel structure workshop: Our company insist to use the best quality to win more customer, if there is any question after receive the products, we will provide the best solution to solve the problem our customer have.

 

 

5. Packaging & Shipping for Steel building ( made of connection of steel structure ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) Why should I build steel building using steel structure ?

Steel has the higher strength.

80% recyclable, Steel is the most recycled material in the world.

No warping, no cracking, no chemical treatments.

Stronger connection.

Lower transport costs due to lightweight frames.

Steel frames will not burn, fire proof.

Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.

Each steel structure is a independent engineered.

 

2) How difficult is it to install Steel building ( made of connection of steel structure ) ?

Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: