Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T,L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Products description for the Steel building ( made of carbon structural steel ) :
Main Steel | |
Steel Beam Column | Q235B , Q345B |
Secondary Steel | |
Tie Bar | Q235B |
Purlin | C and Z purlin |
Bracing | Q235B |
Accessories | |
Surface | Painted or Hot Dip Galvanized |
Door | Rolling Up Door or Sliding Door |
Window | PVC or Aluminum Alloy |
Roof and Wall Panels | Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich Panel , PU Sandwich Panel |
Others | |
Service | Design , Fabrication and Installation |
We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings . | |
Design software : Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc | |
Packing | main steel frame with 40 OT roof and panel load in 40 HQ Or According To Customer Requirement |
2. Our strength on the Steel building ( made of carbon structural steel ):
1) Rich experience
Rich project experience in different area of different continents.
2) Professional design and R& D team
Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.
3) Advanced production equipment
We possess plenty of advanced production equipment for structure steel and cladding materials.
4) Quality control
Professional procurement team making sure all materials with good quality and are from China top steel mills.
Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.
Our factory operation under highest international standard, ensure the steel fabrication works with high technology.
3. Project case- Angola steel structure project, 18800m2:
In 2003, Our company took over the workshop steel structure project of an Angola company, the steel structure building has been completed by now. The whole steel structure building area is 18800m2. This steel structure is particularly special, it has a certain technical difficulties. In order to carry on the project installing smoothly, Our company sent an outstanding engineer to direct the installation of the steel structure building. With 3 months hard work, we completed the project perfect finally. The customer was very satisfied with our work and gave the new steel structure workshop project drawing to us, we were excited about this. This indicates that the customer is well accepted with our steel structure production and they trust Our company. Therefore, we will work harder to make more satisfying steel structure for customers.
4. Our complete flow Service for the Steel building ( made of carbon structural steel ) :
1) Before sales of prefab steel structure building: We will provide you the most suitable product, guide our customer to find the products you most needed, assure that our customer can pay least money and get most return.
2) Technical Consultation and Suggestion before Construction: We provide professional consultation and suggestion service for customers' project evaluation about how cost and duration.
3) After sales service of prefab steel structure workshop: Our company insist to use the best quality to win more customer, if there is any question after receive the products, we will provide the best solution to solve the problem our customer have.
5. Packaging & Shipping for Steel building ( made of carbon structural steel ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) Q: How could I control the cost of building a Steel building ( made of carbon structural steel ) ?
A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
2) Q: How Long does it take to build a Steel building ( made of carbon structural steel ) ?
A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.
3) Q: Is it difficult to build a Steel building ( made of carbon structural steel ) ?
A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.