Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Steel building ( made of high steel structures ) main components :
SIZE(m) | LENGTH * WIDTH * EAVE HEIGHT |
TYPE | SINGLE SPAN , DOUBLE SPAN , MULTI - SPAN |
ONE FLOOR , TWO FLOORS , THREE FLOORS | |
BUILDING FOUNDATION | STEEL FOUNDATION WITH ANCHOR BOLTS |
COLUMN & BEAM | MATERIA L :Q235B & Q345B |
BRACING | X or V TYPE BRACING MADE BY ANGEL STEEL , ROUND Bar etc |
Wall & Roof C or Z PURLINE | SIZE :C120 ~ C320mm ; Z100 ~ Z300mm |
WALL & ROOF PANEL | SINGLE CORRUGATED STEEL SHEET |
SANDWICH PANEL INSULATION WITH EPS , PU , ROCK WOOL etc | |
WINDOW & DOOR | PVC or ALUMINIUM ALLOY WINDOW |
ELECTRIC ROOL - UP DOOR | |
SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET | |
SURFACE TREATMENT | HOT GALVANIZED COATING COLD GALVANIZING |
Spray - Painting , Any color , or according to your request | |
ACCESSIORES | SEMI - TRANSPARENT SKYLIGHT BELTS |
VENTILATORS ; DOWN PIPE ; GUTTER | |
STANDARD BOLTS |
2. Who we are:
We are an integrated and professional steel building & steel structure provider in Shandong China. Specialized in the fields of steel structure building manufacturing and international business, Based the principle of sincerity, credit, mutual benefit and rich resources from China we have provided best quality products and value-adding service to customers for more than 15 years. As return, we won top reputation and established long-term business relation with customers from more than 50 countries and regions. Our customers are very satisfied with our good reputation, efficient working system, good service for resourcing, inspection, loading, installation guidance and claim solving.
Our top serviced client include SIEMENS, GE, India Adani Power, Hyundai Steel etc.
3. Project case- Uganda Steel Coil Processing Plant:
Detailed introduction
Project Description: 30x 120M
Project Type: Gable frame PEB structure with office mezzanine building, Stairs, Platform, etc
Time: Oct. 25, 2012
Location: Uganda
Description:
Site anchor bolt installation all ready finished as planed and all engineering are made as per existing plan to save the client' s investment cost of foundation preparation. We supply the steel structure and panel system within 20 days, which make client very satisfied and we found continuous cooperation with this client after the 1st order.
4. Fabrication Services for Steel building ( made of high steel structures ) :
With the annual output of 200, 000 tons. We have 10 fabrication facility lines equipped with CNC cutting, drilling and milling capabilities. We are staffed with skilled CWI, production planning teams, and experienced steel structure building fabricators and painters. Each of our plants has its own unique strengths and assets, which makes us the optimal choice for any type of steel structure building project or heavy / complex steel structure.
5. Packaging & Shipping for Steel building ( made of high steel structures ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) How about the derust grade of your Steel building ( made of high steel structures ) ?
Reply: Ball blasting Sa2.5 on main steel structure or by Galvanized frame;
manual derust St2.5 on secondary steel structure.
2) What kind of panel used for the roof and wall ?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation, sound insulation. Common sandwich materials are EPS, glass wool and PU sandwich panels.
3) Are Steel building ( made of high steel structures ) expensive ?
Answer: The steel structure of our company is economic. Its technology and materials used decreases waste expenses such as wood, decorative stone, brick etc. All the material including the steel frames, wall body and roof for installation are prefabricated during the production process, therefore the labor costs for installation is decreased.