Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Technical parameters for Steel building ( made of parede steel frame ) :
Size | According to customer's requirements |
Standard | GB , DIN , JIS , BS , ASTM |
Material | Q235 ; Q345 |
Surface treatment | Painted with epoxy paint or zinc rich paint |
Package | In bundle or pallet or according to the requirements of customers |
Delivery | Container or Bulk |
Shipment Time | According to the quantity and specification of each order |
Production Usage | Used in industrial or civil fields |
Product Characteristics | 1 . Fine gloss exterior , anti-corrosive 2 . High strength , satisfactory property of the steel 3 . Anti-seismic , wind resistance , environmental protection 4 . Fire- resistant , clean and health 5 . 50-year-long life expectancy |
Remark | Payment terms : T/T, L/C |
Terms of trade | FOB , CFR , CIF , EXW |
2. Our products scope include:
Single layered light and MID-sized workshops and warehouses, Steel building ( made of parede steel frame ), single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc
3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:
Main steel frame:
Steel beam & column: Q345, Welded H beam
Wind-resistant column: Q345, Welded H beam
Secondary frame:
Roof purlin: Z250*75*20*2.2
Ceiling purlin: C120*50*20*2.2
Wall purlin: C180*70*20*2
Tie bar: 102*2
Vertical & horizontal bracing: 20
Kneel-bracing: L504
Purlin bracing: Q235, 12
Sleeves tube: Q235, 32*2.5
Roof system:
Type V930 pu panel 0.5/100/0.6mm Pu panel
Wall system:
Type v930 panel 0.5/100/0.6mm Pu panel
This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.
4. Our company Engineer Strengths for Steel building ( made of parede steel frame ) :
We have attracted lots of talents to attend our team, like senior engineers with professor titles, first-class registered constructors, first-class registered structural engineers, first-class registered cost engineer, registered architect, American CWI engineer, EN TWI engineer, EN IWE welding engineer, American NACE painting engineer and various technicians with senior and medium professional titles.
5. Packaging& Shipping for Steel building ( made of parede steel frame ) :
1) All the structure components, panels, bolts and sorts of accessories will be well packed with standard package suitable for ocean transport and loaded into 40' HQ.
2) All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers, who will prevent the goods to be damaged.
3) Good relationship with many vessel companies to make sure the transportation smooth.
6. FAQ:
1) Why should I build steel building using steel structure ?
Steel has the higher strength.
80% recyclable, Steel is the most recycled material in the world.
No warping, no cracking, no chemical treatments.
Stronger connection.
Lower transport costs due to lightweight frames.
Steel frames will not burn, fire proof.
Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.
Each steel structure is a independent engineered.
2) How difficult is it to install Steel building ( made of parede steel frame ) ?
Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.