Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116359

You are here: home  > Steel Structure  > prefabricated steel structures  > modular structures prefabricated steel structures CE certified

modular structures prefabricated steel structures CE certified 

Price: 1000.0 USD 
Payment Terms: T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 2-033
Production Capacity: 3000 Ton/per Week
Delivery Date: usually as customers'order
Top client Serviced: SIEMENS, American GE, FRANC...
Drawing Design: dwgs Detailing by us
Shipment by: Shipment: 20'GP, 40'GP, 40'...
Means of Transport: Ocean
Packing: sea worthy packing
Brand Name: HX
Software used: AUTOCAD 3D3S PKPM Tekla
Surface Treatment: Gray paint, red paint, whit...

1. Steel structure component be in nude package
2. Engineers' guidance on-site is available
3. Design: to customer's requirement or we design

1. Steel building ( made of modular structures ) main components :

SIZE(m)

LENGTH * WIDTH * EAVE HEIGHT

 

TYPE

SINGLE SPAN , DOUBLE SPAN , MULTI - SPAN

ONE FLOOR , TWO FLOORS , THREE FLOORS

BUILDING FOUNDATION

STEEL FOUNDATION WITH ANCHOR BOLTS

COLUMN & BEAM

MATERIA L :Q235B & Q345B

BRACING

X or V TYPE BRACING MADE BY ANGEL STEEL , ROUND Bar etc 

Wall & Roof C or Z PURLINE

SIZE :C120 ~ C320mm ; Z100 ~ Z300mm

 

WALL & ROOF PANEL

SINGLE CORRUGATED STEEL SHEET

SANDWICH PANEL INSULATION WITH EPS , PU , ROCK WOOL etc

WINDOW & DOOR

PVC or ALUMINIUM ALLOY WINDOW

ELECTRIC ROOL - UP DOOR

SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET

SURFACE TREATMENT

HOT GALVANIZED COATING COLD GALVANIZING

Spray - Painting , Any color , or according to your request

 

 

ACCESSIORES

SEMI - TRANSPARENT SKYLIGHT BELTS

VENTILATORS ; DOWN PIPE ; GUTTER

STANDARD BOLTS

 

2. We can supply the service for the follow products:

Steel Structure for industrial field, steel structure for civil fields, Steel building ( made of modular structures ) , steel buildings, steel workshop, high rise building steel warehouse, steel frame, steel portal frame, etc.

Our best service:

1) You are very welcome to visit our factory before the order, or during the production or after the production before loading.

2) We are very professional in all the kinds of different payment term, FOB, CIF, CFR by sea container or by train.

3) For the steel frame you require, you are very welcome to offer your own design, or you give us your idea, we provide our design, the production, the loading all for you.

 

3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) :

The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .

Main steel structure: welded H steel;

Purlin: cold-rolled C section steel;

Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.

 

4. Certificates & Quality Management for the Steel building ( made of modular structures ) :

We have ISO9000, 14000, 18000 by BV France, AWS& EN welder, CE etc to ensure our whole production progress controllable.

We also have systematic Quality Process and Progress Control documentation: Our fabrication process have been controlled by series of documentation and quality testing which are monitored and certificated by BV, SGS, SKM, JACOBES etc world-famous third party inspection organization.

 

5. Packing & Delivery for Steel building ( made of modular structures ) :

For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift

For cladding: Plastic film wrap the roof and wall corrugated single steel plate.

but for sandwich panel will load into container piece by piece

This package is to protect the goods from damage, during the transportation.

 

Delivery:

Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.

Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.

 

6. FAQ:

1) How can I install these Steel building ( made of modular structures ) together as a building after cargo arrived ?

Normally, most clients choose to install the steel building structure frame themselves or ask local technical engineer for further instruction.

If local technical support is not available or cost too much, we could also provide technical support engineer cross over-seas for installation guide even with our installation engineering team.

 

2) How to maintain my Steel building ( made of modular structures ) years of using ?

Steel building ( made of modular structures ) are built for long-time, reliable, steady usage purpose, the maintenance process is easy to operate and complete, most our product can live 10-15 years with minimal maintenance work like gel filled and paint spray. We will keep tracking the usage performance of our products and provide maintenance instruction for our clients.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: