Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116359

You are here: home  > Steel Structure  > prefabricated steel structures  > prefabricated steel structures formed metal building frame of three story

prefabricated steel structures formed metal building frame of three story 

Price: 1000.0 USD 
Payment Terms: T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-39
Production Capacity: 8000 Ton/per Month
Delivery Date: 20 days
Top client Serviced: SIEMENS, American GE, FRANC...
Quality Control: The third party, SGS, ASIA ...
Drawing Design: by client or by us
Means of Transport: Land
Packing: Components will be packaged...
Brand Name: HX
Product Characteristics: 1)Fine gloss exterior, anti...
Installation: Engineer are able to stay a...

1. Sandwich panel into container piece by piece
2. NDT on welding joints is carried out
3. Roof& wall panel: PU, EPS, rock wool panel

1. Description of Steel building ( made of prefabricated steel structures ) :

Steel structure building is a new type of building structure system , which is formed by the main steel framework linking up H-section , Z-section , and U-section steel components , roof and walls using a variety of panels and other components such as windows and doors . Steel structure building is widely used in warehouses , workshops , large factories , and so on .

Dimensions

Length

H-beam : 4000 - 15000mm

Thickness 

web plate : 6 - 32mm      

wing plate : 6 - 40mm

Height

200 - 1200mm

Color

according to customers

Main components

Main frame

H beam

Purlin

C or Z section steel purlin

Brace

Anchor , ordinary , high strength bolt

Bolt

Sandwich panel or steel plate

Roof & wall

PVC or aluminum alloy door

Door

Sliding or rolling door

Insulation panel

EPS , Rock wool , PU sandwich

Material

Q235B , Q345B China standard steel

Sheet

0.5mm or 0.6mm galvanized sheet

 

 

2. Who we are:

We are an integrated and professional steel building & steel structure provider in Shandong China. Specialized in the fields of steel structure building manufacturing and international business, Based the principle of sincerity, credit, mutual benefit and rich resources from China we have provided best quality products and value-adding service to customers for more than 15 years. As return, we won top reputation and established long-term business relation with customers from more than 50 countries and regions. Our customers are very satisfied with our good reputation, efficient working system, good service for resourcing, inspection, loading, installation guidance and claim solving.

Our top serviced client include SIEMENS, GE, India Adani Power, Hyundai Steel etc.

 

3. Project case- Shandong Weifang Metal Logistics Co., Ltd light steel structure warehouse, 17000 SQM:

Type: Welded H-Section Steel

Forming: Hot-Rolled Steel

Crane:with or Without(1 to 50 Tons)

External Wall Design: EPS/ Rock Wool/ Polyurethane/ MGO/ Cement Foam Panel

Life Time of Steel Frame:More Than 50 Years

Packing Method: Flat Pack, Open Top Container, by Steel Skid, etc.

Raw Materials: Q235/ Q345

Door: Sliding Door, Roller Door, Steel Door etc.

Window: PVC, Aluminium( Sliding and Fix)

 

4. What you can get from us for your demanded Steel building ( made of prefabricated steel structures ) :

1) Steel structure special designing and processing

2) EPS sandwich panel( for wall, roof, floor)

3) All construction & decoration materials &downpipe are strictly selected.

4) Designing & Installation drawings( in details)

5) Full support in installation technology & guidance

6) Engineers' guidance on-site in your place is available

7) Custom-made service is available

 

5. Packaging & Shipping for Steel building ( made of prefabricated steel structures ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) Q: How long is your delivery time for Steel building ( made of prefabricated steel structures ) ?

A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of Steel building ( made of prefabricated steel structures ).

 

2) Q: What is the colors of your sandwich panels usually used ?

A: Off-white, ivory white, blue, green and red color.

 

3) Q: How can I get the quotation of the project ?

A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: