Shandong Huaxing Steel Structure Co., LTD.
|
Gold Index: 116359
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Design parameters of the Steel building ( made of fabrication of structural steel work ) need to be provided :
1) Live load on roof ( KN/M2 ) |
2) Wind speed ( KM/H ) |
3) Snow load ( KG / M2 ) - If Applicable |
4) Crane ( if you have ) , Crane span , Crane lift height , max lift capacity , max wheel pressure and min wheel pressure |
5) Size : width X length X eave height , roof slope |
6) Or your idea ! |
BUT maybe you are unsure about what type or what needs you have regarding your warehouse / workshop , or this project is your first one . Don't worry , we will teach you to choose the right style and the finest design within your budget . |
2. Our Products Scope:
1) Steel Structure for industrial and power fields, such as power plant, steel mill, solar industry, hydroelectric plant, petrochemical fields, oil and gas pipeline, etc.
2) Steel Structure for civil fields, like high-rise building, heavy Steel Structure, workshop& warehouse, etc.
3. Project case- Congo Hebe Fabrication Petro-chemical Plant Module:
Product Description
Type 1 steel warehouse( 2500 m2) details:
A. Length: 130m
B. 10 meters between the 7 main frames
C. Height: 10 meters inside
D. Slope for roof: 23%
E. Aluminium panels for Roof with 35um coating thickness
F. 10T Overhead bridge Crane( also known as dual-beam bridge / gantry crane bridge
G. The Congo client need the side walls( only 3 sides) , for the 4th side, quoting a self collapsing gate
4. Our company Engineer Strengths for Steel building ( made of fabrication of structural steel work ) :
We have attracted lots of talents to attend our team, like senior engineers with professor titles, first-class registered constructors, first-class registered structural engineers, first-class registered cost engineer, registered architect, American CWI engineer, EN TWI engineer, EN IWE welding engineer, American NACE painting engineer and various technicians with senior and medium professional titles.
5. Packaging& Shipping for Steel building ( made of fabrication of structural steel work ) :
1) All the structure components, panels, bolts and sorts of accessories will be well packed with standard package suitable for ocean transport and loaded into 40' HQ.
2) All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers, who will prevent the goods to be damaged.
3) Good relationship with many vessel companies to make sure the transportation smooth.
6. FAQ:
1) Q: How long is your delivery time for Steel building ( made of fabrication of structural steel work ) ?
A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of Steel building ( made of fabrication of structural steel work ).
2) Q: What is the colors of your sandwich panels usually used ?
A: Off-white, ivory white, blue, green and red color.
3) Q: How can I get the quotation of the project ?
A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.
Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]
Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)