Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Steel building ( made of lightweight steel frame ) main components :
SIZE(m) | LENGTH * WIDTH * EAVE HEIGHT |
TYPE | SINGLE SPAN , DOUBLE SPAN , MULTI - SPAN |
ONE FLOOR , TWO FLOORS , THREE FLOORS | |
BUILDING FOUNDATION | STEEL FOUNDATION WITH ANCHOR BOLTS |
COLUMN & BEAM | MATERIA L :Q235B & Q345B |
BRACING | X or V TYPE BRACING MADE BY ANGEL STEEL , ROUND Bar etc |
Wall & Roof C or Z PURLINE | SIZE :C120 ~ C320mm ; Z100 ~ Z300mm |
WALL & ROOF PANEL | SINGLE CORRUGATED STEEL SHEET |
SANDWICH PANEL INSULATION WITH EPS , PU , ROCK WOOL etc | |
WINDOW & DOOR | PVC or ALUMINIUM ALLOY WINDOW |
ELECTRIC ROOL - UP DOOR | |
SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET | |
SURFACE TREATMENT | HOT GALVANIZED COATING COLD GALVANIZING |
Spray - Painting , Any color , or according to your request | |
ACCESSIORES | SEMI - TRANSPARENT SKYLIGHT BELTS |
VENTILATORS ; DOWN PIPE ; GUTTER | |
STANDARD BOLTS |
2. Our Products Scope:
1) Steel Structure for industrial and power fields, such as power plant, steel mill, solar industry, hydroelectric plant, petrochemical fields, oil and gas pipeline, etc.
2) Steel Structure for civil fields, like high-rise building, heavy Steel Structure, workshop& warehouse, etc.
3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:
Main steel frame:
Steel beam & column: Q345, Welded H beam
Wind-resistant column: Q345, Welded H beam
Secondary frame:
Roof purlin: Z250*75*20*2.2
Ceiling purlin: C120*50*20*2.2
Wall purlin: C180*70*20*2
Tie bar: 102*2
Vertical & horizontal bracing: 20
Kneel-bracing: L504
Purlin bracing: Q235, 12
Sleeves tube: Q235, 32*2.5
Roof system:
Type V930 pu panel 0.5/100/0.6mm Pu panel
Wall system:
Type v930 panel 0.5/100/0.6mm Pu panel
This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.
4. How we ensure the high quality of Steel building ( made of lightweight steel frame ) :
After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:
1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.
2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .
3) Professional non-destructive testing, fully equipped.
4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.
5) More than 10 years steel structure fabrication experience
6) Full set of manufacturing process plan to ensure delivery on time.
5. Packaging& Shipping for Steel building ( made of lightweight steel frame ) :
1) All the structure components, panels, bolts and sorts of accessories will be well packed with standard package suitable for ocean transport and loaded into 40' HQ.
2) All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers, who will prevent the goods to be damaged.
3) Good relationship with many vessel companies to make sure the transportation smooth.
6. FAQ:
1) How can i get the quotation of the product of Steel building ( made of lightweight steel frame ) ?
A:
(1) If you have drawing, we can give you our quotation according to your drawing.
(2) If you have no drawing, my company will make a layout drawing. After you make sure all details in the drawing is no problem, we will send our quotation according to the drawing.
2) Is your price competitive with other companies ?
A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost.
3) Do steel constructions harm the nature ?
Answer: Steel is 80% recycling material. So it does less harm to the nature compared with the other type buildings.