Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Products description for the Steel building ( made of large span steel structures ) :
Main Steel | |
Steel Beam Column | Q235B , Q345B |
Secondary Steel | |
Tie Bar | Q235B |
Purlin | C and Z purlin |
Bracing | Q235B |
Accessories | |
Surface | Painted or Hot Dip Galvanized |
Door | Rolling Up Door or Sliding Door |
Window | PVC or Aluminum Alloy |
Roof and Wall Panels | Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich Panel , PU Sandwich Panel |
Others | |
Service | Design , Fabrication and Installation |
We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings . | |
Design software : Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc | |
Packing | main steel frame with 40 OT roof and panel load in 40 HQ Or According To Customer Requirement |
2. Company Advantages:
Our Corporation is able to offer complete services for pre-engineered buildings and steel structure projects including: design, fabrication, erection and after-sales services. This integrated production process will bring to our customers huge advantages of an optimal solution, high-quality products and perfect services.
WHAT MAKES US DIFFERENT ?
1) Competitive price
The advanced self-contained high automatic design production line along with experienced and professional staffs help us to bring out the most competitive price.
2) Quality assurance
We produces all structural components of pre-engineered buildings, steel structure projects at the factory with ISO 9001: 2008 quality control system. we have a Quality Control Department who guarantees our products to meet international standards.
3) Fast delivery
With 200, 000 m2 of manufacturing factory and a professional highly trained erection team who is strictly supervised by project management board, we are committed to manufacturing and provide products on schedule.
3. Project case- Shandong Weifang Metal Logistics Co., Ltd light steel structure warehouse, 17000 SQM:
Type: Welded H-Section Steel
Forming: Hot-Rolled Steel
Crane:with or Without(1 to 50 Tons)
External Wall Design: EPS/ Rock Wool/ Polyurethane/ MGO/ Cement Foam Panel
Life Time of Steel Frame:More Than 50 Years
Packing Method: Flat Pack, Open Top Container, by Steel Skid, etc.
Raw Materials: Q235/ Q345
Door: Sliding Door, Roller Door, Steel Door etc.
Window: PVC, Aluminium( Sliding and Fix)
4. We can provide shop and installation drawing for Steel building ( made of large span steel structures ) :
1) After reaching a contract, we will carry out a detailed design in terms of the structural drawing and architectural drawing, build a three-dimensional model system by Tekla Structures( Xsteel) , and work out the shop drawing of each component efficiently and accurately. This not only can benefit future precise manufacturing but also can avoid component collision during construction in later stage.
2) We produce according to the process drawing and make delivery according to the shipping list.
3) We provide a complete set of installation drawings. If the customer has requirements, we can provide installation guiding services.
5. Packing & Delivery for Steel building ( made of large span steel structures ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) Can I have a visit to your factory before the order ?
A: Why not ? welcome to visit our factory. You can fly to Jinan Airport. We will pick you up in the airport. Hotel booking service is available.
2) Do you supply installation service for Steel building ( made of large span steel structures ) ?
A: Yes, we do. But you will pay for our professional fee if we install in your local place. Then we will send engineers to supervise it.
3) How long can the Steel building ( made of large span steel structures ) be used ?
A: The use life of the main structure is the designed used life, that is 50-100 years( standard request of GB) .