Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. components and materials of the Steel building ( made of pre engineered structures ) :
Main structure | Welded H section , Lattice structure , Tubular column or beam , space frame etc |
Purlin | C Section Channel or Z Section Channel |
Roof Cladding | Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil |
Wall Cladding | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Column & Transverse Brace | Angle Steel or H Section Steel or Steel Pipe |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Rainspout | PVC Pipe |
Door | Sliding Sandwich Panel Door or Metal Door |
Windows | PVC/Plastic Steel/Aluminum Alloy Window |
Connecting | High Strength Bolts |
Packing | Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ |
Drawing | We can make the design and quotation according to your require or your drawing |
2. Our company brief :
Our company is the comprehensive enterprise, which gathers the design, processing, production, sale and installation for steel structure. It had passed the certificate of ISO9001:2008 International Quality System and got the Safely Production License. It is located in Shandong province China. The company not only has advanced technique but also has the scientific management system, so the productive force developed rapidly. The company has many production lines for light steel, heavy steel, pipe lines, pressure vessel, steel structure H steel etc. The products adopt high quality raw material from domestic and abroad. The quality and variety of products were in leading position in the same field. It has good prestige. Consequently, our products are selling well in the American, European, Japanese, Asian and the Middle East markets. Due to our quality assurance, competitive prices, and on time delivery, we have developed a large base of repeat customers and got excellent public praise and the best reputation.
3. Project case- Russia Office Building, workshop and warehouse Project, 2012:
Detailed introduction
Project Scale: 3-floor heavy office building, 10ton crane in workshop and warehouse, total 3 buildings, tonnage 1240ton
Project scope: Construction drawings design, shop-drawing design, material procurement, steel structure fabrication and painting, and floor deck
4. What you can get from us for your demanded Steel building ( made of pre engineered structures ) :
1) Steel structure special designing and processing
2) EPS sandwich panel( for wall, roof, floor)
3) All construction & decoration materials &downpipe are strictly selected.
4) Designing & Installation drawings( in details)
5) Full support in installation technology & guidance
6) Engineers' guidance on-site in your place is available
7) Custom-made service is available
5. Packaging & Shipping for Steel building ( made of pre engineered structures ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) How to buy your ideal Steel building ( made of pre engineered structures ) ?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.
2) What is the delivery time of Steel building ( made of pre engineered structures ) ?
A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.
3) How to install after the goods arriving destination ?
A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
4) Q: Does your steel building can only be used in residential building ?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.