Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. components and materials of the Steel building ( made of steel structure section ) :
Main structure | Welded H section , Lattice structure , Tubular column or beam , space frame etc |
Purlin | C Section Channel or Z Section Channel |
Roof Cladding | Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil |
Wall Cladding | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Column & Transverse Brace | Angle Steel or H Section Steel or Steel Pipe |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Rainspout | PVC Pipe |
Door | Sliding Sandwich Panel Door or Metal Door |
Windows | PVC/Plastic Steel/Aluminum Alloy Window |
Connecting | High Strength Bolts |
Packing | Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ |
Drawing | We can make the design and quotation according to your require or your drawing |
2. Our strength on the Steel building ( made of steel structure section ):
1) Rich experience
Rich project experience in different area of different continents.
2) Professional design and R& D team
Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.
3) Advanced production equipment
We possess plenty of advanced production equipment for structure steel and cladding materials.
4) Quality control
Professional procurement team making sure all materials with good quality and are from China top steel mills.
Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.
Our factory operation under highest international standard, ensure the steel fabrication works with high technology.
3. Project case- Industry Prefabricated Steel building:
Argentina prefabricated steel workshop project was done in the year of 2013, finished installation in the year of 2014. Total area of this workshop is 5, 700 square meters. Main workshop size is 84X 60X 9m, totally 4 spans, 15m per span with one 3ton crane in each, lifting height of the crane is 6m. Two accessory houses on both sides of the main workshop.
4. Fabrication Services for Steel building ( made of steel structure section ) :
With the annual output of 200, 000 tons. We have 10 fabrication facility lines equipped with CNC cutting, drilling and milling capabilities. We are staffed with skilled CWI, production planning teams, and experienced steel structure building fabricators and painters. Each of our plants has its own unique strengths and assets, which makes us the optimal choice for any type of steel structure building project or heavy / complex steel structure.
5. Packaging & Shipping for Steel building ( made of steel structure section ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) Do you provide on-site installation service for Steel building ( made of steel structure section ) ?
We provides customers with one-stop integrated steel building solution including installation and operation. We have 3 options for on-site installation according to the customer' s specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.
2) What' s your delivery time of your Steel building ( made of steel structure section ) ?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.